Monday, July 25, 2011

Long Overdue Update

With the entire Northwest in the third month of seasonal affected depression, you can understand why I might be lacking motivation to update a blog. I know much of the country is in a heat wave, and I don't want that either, but the rain and gray is starting to get to me, and I grew up here. You can imagine how it is affecting Hayden, a southern California girl used to sunbathing and flip flops.

There is much to update! Just because we haven't been posting here doesn't mean we haven't been working. The big news is that it looks like we are on target for a launch by the end of August. Yep. Our little Cape Dory will be in the water this summer. (Fingers crossed).

This past week was really the first time the progress seemed real to me. We are definitely building up rather than tearing down, and I can list the remaining projects without a spreadsheet.

Our BetaMarine 14 is here, resting at the SeaMarine shop in Port Townsend until we are ready to drop it into its new home behind the companionway stairs. That will be the last thing to happen until we get the boat trucked back to the marina. Then we will focus on the rigging and actually setting the boat up.

But for now, let's take a look at some progress!

Battery Boxes
The battery "box" in the boat when we got her was nothing more than a rotting plywood shelf with two Costco wet-cell batteries sort of wired to the boat. I still can't figure out how he had them wired.

The Battery "Solution" as we Found it.
So I tore that mess out and ground the space down to clean fiberglass. Then it was a matter of building back up. We are running 2 Group 31 AGM batteries for our house bank, which is overkill but will give us weeks of off-the-grid power. A smaller AGM will serve as the starting battery.

The next image is of the marine-grade plywood shelf I built and installed in place of the old box.
The Battery Shelf Tabbed to the Hull and Clear-Coated with Epoxy
You can see one of the logistic problems with the install in this photo: the thru-hull for the cockpit drain is under the edge of the shelf. If I put the support as far inboard as I wanted to, I would have had to move the thru-hull. No thanks. So I offset the shelf support a bit.

Here is the view looking aft from the companionway:

Note the small lip around the outside to keep things from sliding around should the tie-downs fail and the openings forward and aft for drainage should any water get on there. From there I painted the whole thing out with my trusty white BilgeKoat paint. The two battery boxes fit perfectly:

They are parallel wired and sitting on a trickle charger as I write this, waiting for the final wiring to take place.

The Fuel Tank
It may shock to you learn two things. One, the old aluminum fuel tank was leaking and corroded when we bought the boat. And two, finding a direct replacement for it without resorting to expensive custom tanks is pretty much impossible. Here's a glimpse at the old situation:

The Old Fuel Tank

Out of the Boat

The Existing Space


That little nook is a dimension that doesn't exist in modern tank building. For a while, as I searched for a new tank, I had the dimensions memorized. One limitation you can't see here is the same as for the battery shelf: the thru-hull for the cockpit drain limits the fore and aft length of the tank. Behind the bulkhead forward of the tank is the galley, so we can't go that direction either.

I bought a 12 gallon Moeller tank that was pretty close to fitting, but with the existing shelf I just couldn't make it work. So...out comes the Sawzall and the grinder. And the dust mask.

I tore the whole thing out and started from scratch. Again. Here is the new shelf built of 1/4" marine plywood and glassed to the hull.

The New Tank Shelf Tabbed to the Hull
This design created a big dead space under the shelf that is accessible from the engine compartment. Rather than block this off, I decided to make a cupboard for storing engine spares and tools. The access won't be great with the engine in place, but for things I don't need often, it should be a good solution.

Showing the "Dead Space" Beneath the Shelf

With the Facia on and a Cut Out for the Door
For some reason I don't have any photos of the tank in place. But it's there and plumbed to the deck fill and the tank vent with new hose and fittings. The Racor fuel filter will hang on the facia aft of the cupboard door.



Electrical Panels
The old electrical system was a total disaster. From the panel to the wiring, everything was a mess. I tore it all out. New wire, new fixtures, and new panels.

The old panel was on the small bulkhead above the galley:

That had to go. Here is the space after it was gone:



The square cutout to the left is access to the back of the cabin top to fiberglass in the old holes from the instruments. More on that later. The main electrical panel will go on the starboard side of the companionway where there was just an empty bulkhead. On this side, above the galley, we decided to have a small panel with the LPG control and a couple of 12 volt outlets for charging phones and whatever else. It is also accessible from the cockpit, so we could run a spotlight from here as well. Here is the panel I came up with, made of mahogany and marine plywood, stained with Cetol Marine Teak. The blank space above can hold an instrument display or another switch if it becomes necessary. We'll leave it blank for now. The panel will hinge on the left-hand side and latch with a cabinet latch.

 On the other side of the companionway will be the main distribution panel. It will have the AC and DC switches, the bilge pump switch, an AC outlet, and a battery meter. Here it is with the AC and DC panels installed. There is enough room on the back side of this for a few bus bars and other wiring niceties.

There are many more projects under way and just about completed, but I think this post is long enough! More soon.

Friday, March 4, 2011

Emerging from Darkness

Yesterday the manager of The Boat Yard* (otherwise known as Dad) called me to let me know that the tarp on the boat had collapsed under the weight of snow from a recent late season storm. Of course, by the time I arrived at The Boat Yard, the snow storm had ended and a windstorm had taken its place. Wind speeds on the Washington and British Columbia coasts were recorded at hurricane strength during the storm, and in the city winds topped 40 mph. The Boat Yard is located on Hood Canal, and during winter storms, the typical southerly winds hit us head on. Pictures never do storms any justice, but here's one anyway just because I have it.

Stormy Seas @ The Boat Yard
So it happened that I pulled up to the boat and found the structure for the tarp broken and about 200 gallons of water filling it up. The generator was grinding away, so I knew the storm had knocked the power out. Tree limbs were all over the driveway. So I was faced with this project:

Remove the 40x30 foot tarp, de-assemble the boat cover, rebuild the frame for the cover, and replace the tarp. In 50 mph winds.

Add to that the underneath that tarp were several open holes in the boat. The cockpit locker lids had been removed, and much of the teak in the cockpit had been sanded and cleaned, but left exposed. Once I took that tarp off, I was racing the weather, because as soon as the next wave of the storm hit, it was going to be packing some serious rain.

Removing the tarp was the easy part. Controlling it was not. I untied it on the windward side and it was gone. Wrestling it into a manageable package reminded me fairly vividly of all the failed spinnaker take downs we have done on the race boat. Every time I got closed to controlling the damn thing another gust would come and catch it just right. At one point it actually pulled me over when it caught a healthy amount of air.

Next I set to rebuilding the frame. A mishmash of left over lumber, some screws, and a cordless screwdriver and a mere 3 hours later and I had the skeleton rebuild. It's a crappy job, but it really only has to last another month or two. I assume that this weather will end sometime in the spring and we will be able to uncover the boat.

Then dad and I set about re-tarping the thing. I'm surprised neither of us died. The wind rose another 5 mph, of course, as I tried to tie things down before I lost my grip.

It ain't pretty, and as soon as possible I'm going to re-adjust things, but at the very least, we are keeping things dry again.

One trip to The Boat Yard, $25 in ferry fares, zero work done.

The list of work remaining to be done is looooong, but there is hope that we will be in the water by summer. If the credit card holds out, that is.

With spring break and a reprieve from laboring at The Learning Factory, there should be more opportunities to put in some long days at The Boat Yard between now and May. Here's hoping the worst of the violent weather is behind us.

Oh look, it's snowing again. Ugh.





*The Boat Yard, of course, is my dad's driveway...cheapest dry storage around!

Wednesday, August 25, 2010

The Deep Dark Place

The bilge on the CD 27 uses up every bit of the boat's four foot draft. Even stretched out as far as I can reach, the bottom of that cavern is unreachable.

This presents a bit of an issue with the bilge pumps.

One: How to install an electric pump when you can't reach the bottom of the bilge to install one.
Two: How to keep the manual pump hose fastened down so it doesn't float when the bilge fills up with water?

I puzzled over this for about a year. Then I remembered the installation I saw on an Island Packet a while back.

So I grabbed some cardboard and starting building some mockups. Fun times.

The idea was to make a rack that all of the bilge apparatus would attached to that could be bolted down or removed from the bilge in one piece.

Here is what I ended up with after some cutting and shaping of some plastic StarBoard lumber.

The Bilge "Rack" Ready to Be Installed
I made a shelf for the electric pump that sits about 2 inches off the bottom of the bilge, which should keep it free of debris and reduce clogging. The strainer for the manual bilge pump is screwed to the bottom of the rack and is meant to sit on the very bottom of the bilge. It has a built-in check valve so water won't backflow into the bilge when the pump stops. I ran the wire in split-loom conduit and attached it to the rack with a cable clamp. The circular cutout is a guide for the manual pump hose.

Using the template the rack was made from, I drilled two holes in the forward part of the bilge and epoxied two short pieces of all-thread into them so the holes at the top of the rack would slide over them. 

Looking down at the rack installed. You can see how the hose guide works and also the bolts sticking out waiting for washers and nuts to secure everything in place.
It's a pretty tidy installation, if I do say so myself. If anything goes wrong with either pump, I can unbolt the whole thing and lift it out.

Now that the pumps were both in place, I was able to finally run the hoses up and out of the way in their final position. Here you can see them running up and over the engine compartment. The other hoses you see are the propane hose for the galley stove and a wire conduit for the water pump and port side cabin lights. As soon as I snapped this picture, I realized I should have painted this section of the compartment before installing the hoses. Woops. So I loosened them up and painted everything out before reinstalling them. Nothing like doing a job twice!





Wednesday, August 18, 2010

The Engine

This is what will adorn than nice shiny space under the companionway. Betamarine 16. More later...

Tuesday, August 17, 2010

Diesel Dreams

I get all choked up when I say this, but next week we will put down the deposit to have our brand new 16 horsepower, two-cylinder diesel engine built for our new old boat. Weep. Sniffle.

It's true. The Diesel Santa is coming to The Boatyard early this year, and he will leave a crate in the garage that has a brand new, custom built, red diesel engine inside of it. Realizing that the best time to do almost anything to a boat is when the engine is out of its little hole under the companionway, I have been frantically sanding, grinding, washing, and painting everything I can get to.

With the engine out, here is what we were faced with:

Gross. I let that sit there for a while and then in one full day push, I started in on the problem.

First, the prop shaft and stuffing box had to go. No small affair. Everything is bonded to everything else and nothing wants to move. I pounded away at that damn thing for the better part of a 90 degree day before finally tasting victory. After 30 years, everything was perfectly happy where it was.

Then I realized that the old battery "box" had to go. By box I mean rotting plywood platform that apparently served to hold a couple of leaky lead-acid batteries down. Here is what became of that:

That's a nice pile of crap ya got there. Thanks.

Once the old plywood was out, I had to take out the fiberglass tabbing that held that POS in place. Bring in the grinder. I love that thing.

But it does make a dusty mess of everything. Including the operator.

After several hours of grinding and sanding, I had an inch of dust on everything and a clogged up shop vac. What to do, what to do...Why not just drown it?

So off to the garden to get the hose. I washed down each cockpit locker and the engine compartment, sending my dust into the bilge, where it made a lovely mud. No worries. A heavy duty sump pump and some dredging work will take care of that.

Once the water had dried (2 minutes in the heat of the day) I gave everything a nice bath in acetone, sanded down a few rough spots, and got out the epoxy paint.

And when I left today, there was a nice bed just waiting for a new motor. Isn't it precious?


Tuesday, July 20, 2010

Is This Progress I See Before Me?

Today the offspring and I dropped by to visit the grandparents and check on the boat. Yep. Still there.

When I got out of the car, I was surprised to see Dad pop his head out of the companionway.

"What are you doing, Dad?"

He held up a length of chain and a small come-along winch.

"Figuring out how to get this engine out of here." It was then that I noticed the Hi-Lift parked by the garage. Painters were busily working on the house. "When they go home tonight we can use their lift and yank this thing out of here. If it comes out."

I had long ago unhooked every hose and wire on the engine. I had removed the starter and the fuel filters. It was stripped down as far as it would go. I disconnected the propeller shaft and unbolted the engine mounts. For a couple of months, The Beast - the original Yanmar YSM8 - had been sitting in the engine compartment disconnected from the boat. But would it come out?

What possessed Dad to want it out of there is anyone's guess. But as the kids tore off to the beach to search for treasure (read: shells they could color with permanent markers) I walked up the boat to see that it was pretty much rigged for lifting.

But the lifting would have to wait until the painters called it a day.

In the meantime, I went below and got to work on some other projects. I pulled out the propane hose that needs to be replaced and did a little sanding of the bulkhead. But I was totally unfocused. Then I saw the 100' spool of wire sitting next to the tool kit. I have tried several times to find a good wire run for the cabin lights. But since Cape Dory sandwiched the wiring between two parts of the hull, there is no channel in which to run new wire.

Determined, I grabbed the fish tape and started just jamming it in between the headliner and the hull. Dead end. Dead end. Sliced finger. Dead end. Swear word.

And then? Miraculously that damn fish tape slid from the overhead fixture at the galley right down to where the new panel will be mounted. I have to say I was a bit in shock at my luck, so I left the tape there, sat down, and had a beer. Progress!

After a cold Rainier (PBR wasn't on sale this week), I attached some wire and pulled it back through. Success. One wire run complete from panel to fixture.

The other four main cabin wire runs weren't quite so easy, but with the help of Offspring #1's long arms and skinny fingers, we were able to get wires pulled for 4 cabin lights (which will be one circuit), the fresh water pump, the bilge pump, and the propane fireplace.

Here is said child labeling a wire. The DC panel will go on the bulkhead to the side of the companionway behind her.

By then it was dinner time. And then came the big event.

I carefully drove the Hi-Lift next to the boat and lowered the bucket right over the companionway. Dad hooked up his lifting harness.

I crawled down into the boat and, using the come-along, started lifted the engine an inch at a time to get it free of the boat. It took a little persuading since one of the year engine mounts didn't want to let go, but after a little jostling, the engine broke free and smashed my hand against the fiberglass of the engine compartment. Awesome.

The big question remained. Would the engine fit through the opening under the companionway stairs? It's a safe bet that Cape Dory installed the engine before the deck was even on the boat, so this thing has never been through that opening. I have heard of other owners having to cut away some of the fiberglass to get their engines out.

At first I thought we were screwed. I tried pivoting the engine around the corner like moving a couch through a doorway. No dice. Several other attempts were equally frustrating.

And then I figured it out. By lifting the front of the engine straight up I could work it through the top of the opening. A few clicks on the come-along and there she was. Hanging on a chain, out in the fresh air for the first time in 31 years.

I hopped back on the lift and pulled The Beast free of the boat. Adios.

Dad grabbed a pallet and we set the engine down on the driveway. I have no idea what to do with it next. But driving that Hi-Lift is fun. I could go for more of that.

What a monster this thing is. 31 years of pure neglect.

I mean the engine. Not the girl. She hasn't lived long enough to suffer that much neglect. Yet.

Weirdly, the transmission looks brand new, inside and out. It isn't. But I can't figure out why it looks as good as it does.

So there is the engine.

And here is where it used to live:


Gross. Next step is to clear that space out, replace the thru hulls and seacocks, and paint it all out with a nice epoxy paint. Won't be long and we'll be ready for the new engine. Wherever that might be.

After a satisfying and solid day's work, the kids and I retired to la playa for a sunset fire. As is customary at The Boat Yard.


Thanks Dad.

Sunday, June 6, 2010

Measure Twice, Buy Once

Another update? So soon? Well don't get used to it, because in two weeks we are boarding a plane for Kenya and won't be back anywhere near The Boat Yard until late July.

Which explains why I have been working so furiously over the last two weekends to get some things done. A bonus this weekend: a near 70 degree day that allowed me to open the boat up and dry things out. Ahhhh.

With the fireplace in its home, I decided to finalize all of the plumbing and wiring for the propane system as my first chore for the weekend, starting with the hose for the galley stove. Once I cleaned out the port side lazarette, I wedged myself in there and ran the hose up high against the underside of the deck so it will be out of the way and won't get any abuse when we drag things in and out of that locker. Note to self: make sure you have all of the tools you will need before crawling down there. Getting in and out of that space is not easy. You can't see it in this picture, but I did at least think to tie the lid open so as not to get trapped when a gust of wind slammed it shut.

Here you can see the hose, which I wrapped in some plastic split-tubing for a little extra abrasion resistance. I have miles of that stuff from clearance sale last summer, so I might as well use it. I used the bolts from the hinges on the lazarette to connect the zip ties, saving me the trouble of putting more holes in the deck.

While we're down here, check out that lovely plywood backing block for the winch stand. Awesome. Add replacing those to the list of things to do...
And here is a bonus image. The view from below decks:
The galley supply line fits perfectly, with just a little slack at the propane connection. It's as if I had planned it.

So then I shifted my attention to the starboard side, where the supply line for the fireplace will run. I had already run it through the cabin back to the starboard lazarette. Now all I had to do was finish the run to the propane locker. I gave it the same treatment with the split tubing for chafe protection and attached it to the underside of the deck. Perfect.

Except that it's 2 feet short. Insert string of expletives here. I SWEAR I carefully measured that run before buying the hose. I remember running surveying tape along the proposed path AND adding 3 feet for good luck.

Now I have to go back and undo every hanger along the way (every 12 inches or so) and take the fireplace out in order to disconnect the hose. F Bomb. F Bomb. F Bomb.

Oh, and the longer hose is $100. Do you have any idea how much PBR $100 will buy?

So I abandoned that project for the weekend, started a shopping list for my next trip to Disneyland, I mean Fisheries Supply, and got to work on some other random projects.
  • Finished painting the forward cabin. It's all sparkly white now and looks fantastic. When the newly finished wood panels are back in place, it will look amazing. I didn't really appreciate how nasty the old finish was until the new paint was on and dry.
  • Cleaned up the space where the old fuel tank used to live and made measurements and plans for the new tank. We gain 3 gallons of fuel and upgrade from a steel tank to a poly tank, but it will require cutting up this space to make it fit.
  • Painted out the port lazarette in lovely BilgeCoat White. It looks sharp. Take my word for it.
  • Then I retired to the beach and treated myself to a little camp fire. Just one of the many perks of The Boat Yard.