In my life as a writer I find myself working right up to deadline most of the time. I know it drives editors crazy, but for some reason I do seem to function better on short timelines.

Which is all good, because two weeks ago I scheduled the boat transport truck to come and pick up Peponi. And I still had a LOT of work left to do before that day. So I set to it. Three coats of new bottom paint, mast wiring, battery install, charger install, fresh water system final hook ups, water heater wiring, electrical panel final hook ups, some paint here and there, and cleaning my way off the boat.


I also made a new filler board for the v-berth, as our mattress was made to fill the whole space. I painted the cabin sole in the head, varnished some of the interior teak, and built a shelf for the new electronics to bolt to. More than one late night was spent in a slight panic as I imagined all of the things I hadn't yet done.

The truck was scheduled to come on a Saturday. Friday night at around midnight I took the last of my tools and materials off and closed the companionway. I took the extension cords down and rolled up some painting tarps. And I went to bed, where I slept not at all.

Here are some of the final projects in color photograph format.

Black bottom paint over the first coat of red. Hull is polished and toerail is varnished.
A look at the beige accent paint that is going on all of the nonskid. On the foredeck I will add grit to the paint.

New engine in flight.

New engine in place. I had to cut the companionway to 18" wide to fit it through the gap.
Fresh water system primed and working.
Peponi's electronic suite. This is on the starboard side, aft end of the settee.
New filler board for the v-berth.
Child labor on the night shift, wiring the mast.
Masthead showing the anchor light, wind vane, and Windex mount. New tangs for the  shrouds as well.
The companionway.
The companionway under red lights.
The Day of the Truck
Where was Gus Sebastian when I had the boat hauled to the house in the first place? This guy is awesome. He arrived at 8:00 a.m. just as planned and had no trouble backing down our narrow curvy driveway with his 45 foot trailer.

If you need a boat hauler in the Northwest, this is your guy.
Gus backing in to pick up the boat.

Gus rocked the set up and backed the trailer right on point with one shot. Perfectly centered. Then came time to lift the boat off the blocks, so he enlisted a helper with a lot of XBOX experience...

Taylor learning to lift the boat. "Don't drop it," says Gus. Nice.

Then, before we knew it, she was off to the actual boat yard...

I'll admit to being a little choked up when she pulled away.
Before the truck cleared the driveway, my dad was already tearing down the stairway he had built to access the boat while we worked on it. And then I set to pressure washing the evidence away. 

Peponi now sits at Sea Marine in Port Townsend. They will do the final hookup of the engine, splash the boat and put up the rig. While they are doing that, I'll sneak over after dark and finish some detail work on deck and down below.

And then it's time to sail her home to her slip in Everett. Can't wait.

Meanwhile...
So last week while doing my usual scan of Craigslist for deals on boating stuff, I came across an add for a Cape Dory Typhoon Weekender. Cheap. Figuring something was probably wrong with it, I went to take a look, and damnit, the thing was perfect. The end result is that two hours after Peponi left for the shipyards, this happened.

1973 Cape Dory Typhoon Weekender. The newest resident of the Boat yard.
I might have a Cape Dory problem.

But with results like this, how can I complain?


Saturday, August 18, 2012

So Close We Can Taste It. Wait, That Might be Epoxy I Taste.

Pick Up
The truck comes next week to pick up our boat and deliver her to the marina where final engine installation and rigging will take place.

Mind you, I'm nowhere near ready, but once that truck shows up, the work at The BoatYard is over no matter what, so...

Over the last week or so I have finalized the fresh water system, the AC system, and a few other details. Before she is ready for the experts to take over, I still have to:
  • Finish the bottom paint
  • Hoist the engine into place
  • Install the engine controls
  • Wire the mast
  • Install the masthead
  • Finalize the electronics install
The new interior cushions are waiting for us at the shipyard, as are all the new rigging parts. Once delivered, it will be about two weeks before we're in the water. Just in time for the end of summer!

No Longer Anonymous
Our little sloop is no longer nameless. She was nameless when we bought her (the previous owner vaguely remembered calling her "Boomer" or something). But no more. Honoring Hayden's love of East Africa and our connection to one of the greatest places on the planet, our sloop is now named "Peponi," which means "paradise" or "in the wind" depending on who you ask or how it is translated. Either way, perfect. Peponi is also the name of a beautiful hotel in Lamu, Kenya. Lamu is far and away my favorite place in the world. Somali pirates not withstanding.
Peponi means "Paradise" in Swahili. Sort of.
Priorities
As much as I dreamed of having a gleaming, perfect boat ready to launch when the truck came, I simply had to prioritize things into two categories: Before Splash and After Splash. Quite simply it came down to what needed to be done before the boat could hit the water and be functional (basic systems, integrity of the hull, and bottom paint) and what we could do once she was in her slip at the marina (interior finishing, "luxury" systems, deck work, etc.) So we have several projects outstanding that simply won't get done before we are in the water. But we are very, very close to being ready to sail.

I took advantage of being out of the water and not paying rent to do a few days' worth of finish work on the hull. It came to us chalky, scratched, and basically nasty. I had to repaint the transom (not a perfect job but it definitely passes the 3 foot rule). For the rest of the hull I used a combination of rubbing compound, 1500 grit sandpaper, and wax to get her up to a decent shine. 30 years of neglect can really wreck gel coat. Short of repainting, I think we did the best we could.

Not a brand new boat, but not neglected either.
Much of the teak on deck will have to be done later, but I did take a day to completely sand the toe rails (which took forever to get down to bare wood) and refinish them with 4 coats of Cetol varnish.

 
Toe rail refinished (and new registration #s too!)
One rather comical result of the location of the boat in the driveway is that the port side gets far more attention than starboard. The port side faces the beach and the southern sun, and has a big concrete driveway to work from. The starboard side is right up against the edge of the driveway, and the mast is stored on sawhorses right there, making moving ladders around and whatnot quite a pain. Let's just say the port side looks a little better.

Other Stuff
Not as cool to look at, but more important things have also happened.

I bought a used iPod on EBay to leave plugged into our new Fusion stereo. I just loaded all of my music onto it and now we have a portable juke box. 32 GB worth. That ought to do. And when it gets old, we can just click over to XM satellite radio, which is rather worthless on land in the Puget Sound because of all the trees and whatnot, but on the water it is perfect.

The simple AC system (two outlets, a battery charger, a water heater) is wired.
AC wiring in progress. Probably not to code. But it works.
Wiring the boat has been the biggest learning experience of this project for me. I will do it very differently next time (heh heh) based on what I learned about circuitry and wiring. What I did is technically fine but could be more efficient and better planned. The wire runs are redundant in some places and I made full end runs for each appliance rather than making branch circuits. Again, it's fine (and will be easier to troubleshoot if a lamp goes out) but the wire runs are bulky and the panel is crowded). So far I love the location of the panels I built. I can reach both from the cockpit, they are easy to access, and they are out of the way.

Fun with Fiberglass
If there is a second place finisher in the "what I learned most about" contest, it is epoxy and fiberglass. Now I want to use that shit to fix everything. My last chance to really glass anything will be after the engine goes into place, because I'll have to cut out the companionway to get it to fit. The opening under the stairs is 15" across. The minimum dimension of our new Beta 14 is 18". Sigh.

The last thing I glassed in was a new platform for the starting battery and the muffler.
A Group 24 battery box and Vetus Muffler go here

Engine
The thing I may be happiest about is the new engine. A lightweight, quiet, shiny red Beta 14. Last weekend I installed the engine control panel in the cockpit. Of course, I had to tear the old one out, glass in the space, and recut it for the new panel. But it looks ok.


Top of the Mast
I'm sure in parts of the country where boats are hauled out for the winter it is far easier and more common to maintain the gear at the head of the mast, but when the stick stays in the boat year after year, the summit of the boat gets neglected like crazy. No one likes to be hoisted up there to change a lightbulb. I've been working on the masthead electronics and wiring while the mast is down. Here is where we stand now.
Anchor light, Windex, and wind instrument


Stay Tuned
Photos of the delivery and other final work to come. And then a series of Before/After shots of the entire project. After that it should just be photos of sunsets, cocktails, and the rail in the water as we sail around the Puget Sound.


Tuesday, April 24, 2012

Other People's Mistakes and Lessons Learned Therefrom

It Started Like This
Coffee to start the work weekend at The Boat Yard. All I can think of is how great our boat will look on the mooring out there.
 

What's Under All That Paint?
I truly thought I was done uncovering the sins of the Previous Owner. We discovered his prohibition era whiskey stash under the v-berth. We unwound his "installation" of orange extension cords that stood in for an AC system, we pulled rusty staples out of the woodwork, and replaced brittle PVC pipe with actual marine grade hose. We took the ghastly outboard bracket off the stern.

That was the first weekend.

Then we discovered engine controls tied together with twine and a muffler hanging from the lazarette by a cup hook. Oh, and an engine that was so addicted to starting fluid that it was beyond any rehab program and had to be put to pasture.

Then we started stripping the bottom paint. At least 10 layers of old, red, ablative paint. In some places it simply flaked off like peeling a hard boiled egg. In others it was as permanent as welded steel.

Several months ago I found the first major sin. PO had, at one point, attempted to convert the aft cockpit locker into an outboard well. He, or more likely some dirtbag at the shipyard with a Sawzall, had cut a gap out in the bottom of this locker, just forward of the transom. Some sort of bracket was then bolted to the forward bulkhead of the locker. In theory, an outboard would then be hidden in this nice little locker, hidden from sight and pushing the boat along at a better clip than the little Yanmar thumper under the cockpit. It should be noted here that all of this was done in the place of actually maintaining or fixing the problems with the inboard engine. It just got to sit there and rust (when it wasn't used as a generator to charge the Sears DieHard automotive battery).

A look at the stern and the ill-fated outboard well the PO tried to create. Note that the antifouling line comes up just high enough to cover it up.
The main problem with this outboard well, aside from the fact that the boat wasn't designed for a big cutout under the transom, right behind the rudder, is that the locker itself isn't watertight. It, in fact, is wide open to the rest of the boat (a little design flaw that I intend to rectify before we go off shore...if the flimsy hatch on that locker came off or was stove in by a boarding wave, the whole boat could downflood).  So I'm sure the first time he fired the outboard up and got up to boat speed, the stern sat down in the water, and the stern wave rose up and flooded the boat.

So they likely hauled the boat right out and "fixed" their fix. This fix is what I found when I stripped the bottom paint off the stern. A crappy, unfinished, unsealed fiberglass job covering a 1 foot square hole in the boat.

And this revelation eventually led to another. The one that I spent this weekend cursing the PO for.

The CD 27 originally had anti-fouling paint to the waterline, a 1inch or so gap and then a 3 inch boot stripe (red). Here is a look at another CD 27 with something close to the original look.

Not our 27, but she looks nice.
With our boat, here's what I imagine happened to this look. The PO started loading the boat up with things like, oh I don't know, extra outboard engines and extension cords. As he did so, the resting waterline of the boat dropped a bit. And this, along with what is obviously some long-term neglect, let to marine growth above the waterline.

Then, when he cut that giant hole in the boat and subsequently "repaired" it, he had to cover up his sins. The answer? Raise the waterline. So...when we got this boat, the antifouling paint was about 5 inches higher on the hull than it originally was, a fact I did not notice until I started stripping the paint.

(Is this where I tell you also that he apparently used both hard and ablative antifouling paint on top of one another? Awesome.)

Here is what the boat looks like right now (on the port side, anyway)

Naked Boat.
Want a walk-through? Ok. The blue is just painter's tape that marks the level of the old antifouling paint. It took epic work days to get here. I could have just smoothed the surface of the old paint a little bit and moved on, but the old paint was in terrible shape, and like everything else I've decided to do it right the first time. I think the extra work will be worth it. I hope. There was so much paint on there that just this one side took two gallons of chemical stripper (Interlux 299e for those boat yard nerds out there) and about a million sanding sheets. But now we're down to this.

Ok, HALF Naked Boat
So here is a look from the bow, where I can show you what stripping the paint reveals. Notice on the starboard side there is a little blue paint under the red? In this picture you can see the original look (somewhat). Starting at the blue painter's tape, you can see the dark red. That is the antifouling paint the PO put on with a spatula. But where the antifouling has been removed, you can see a lighter red color. This is the original boot stripe. Then just below that, a 1 inch gap of white gel coat. Below that, the original waterline. See the blue paint? This was the original primer coat. Where I can find the upper edge of the blue primer, I can find the original waterline. And the top of the extended antifouling is the top of the original boot stripe (or near enough, anyway).

Another look at the starboard side paint excavation. Blue primer under antifouling, light red bootstripe under antifouling.
So now I am stuck in my own "do it right the first time" rule, because the "right" thing to do is to carefully reconstruct the original look, stripping the hull all the way down, re-establishing the waterline and boot stripe, and then repainting. But holy hell that seems like a lot of work, and getting a good do on a boot stripe is - according to every boatyard guy I've talked to - one of the hardest things to do in boat painting.

After cursing and kicking things around The Boat Yard, I settled down and went to the web and my trusty colleagues at the Cape Dory discussion boards. It turns out it is pretty common to paint up over the boot stripe. The waterline on the CD 27 was, well, optimistic, and even a lightly loaded boat rode low enough to get marine growth above the theoretical waterline.

There were even some nice photos of boats without the boot stripe, looking very salty indeed.

Photo by Gary Cohen
So, I am starting to lean toward keeping the raised waterline and painting up to it with primer and antifouling, but I haven't made the final decision yet.

Meanwhile, the paint removal has uncovered what HAVE to be the last sins of previous owners. Specifically I have unearthed evidence of a pretty nasty grounding. The rudder appears to be almost completely rebuilt. And not well, I should add. The fiberglass is pockmarked and thin, wide open to water intrusion (which explains why the rudder post dripped water for a month after we hauled her out.

I punched two 1/4" holes in the bottom of it recently just to make sure it is dried out. It seems solid around the rudder post (no play) and sounds fair when wrapped with a plastic hammer, so I don't think it warrants a full rebuild. But I do need to fair in the pockmarks and but down a good sealer coat.

Also, the leading edge and the bottom of the keel are full of repaired spots. I know boats hit the bottom on occasion, so I'm not cursing the PO for that, but I am skeptical enough of the work that has been done on this boat that I am grinding out a few of these larger repairs and doing them myself before repainting anything.

Break Time!
The Management of The Boat Yard has Upgraded the Beverage Selection

The Painting
I will be laying down several coats of Interlux 2000e, a two-part sealer/primer that is used to protect fiberglass from water intrusion and blistering. This is a not cheap step that nonetheless makes me far less worried about the fact that my scraping and grinding and chemical stripping has more or less destroyed the gel coat below the waterline.

Then it is the Northwest standard copper ablative paint, which as yet hasn't been completely banned in Washington.

The Interlux primer is gray. I will do the first couple of coats of ablative in red and the last coat in black. This simple old trick makes it very clear when the effective top coat has washed away and when it is time to repaint. Also, in theory, on the next haulout I can just go down to where everything is red and then re-coat.

Small Stuff
This past weekend also found me finalizing some wiring projects (propane solenoid is wired and functioning, for example). One thing I installed is a propane sniffer.

It is a simple but not cheap product that sounds an audible alarm when propane fumes reach 20% of the low explosive level in the boat. The sniffer is in the bilge well above any realistic water level.
This little guy keeps us from 'sploding
The propane sniffer instrument tucked away under the galley stove.
The panel instrument is on a panel right underneath the galley stove, where I will also put the three-way bilge pump switch and the fuel gage.  The CD 27, like a lot of old boats has very little usable panel space for electronics and instruments, so I'm being creative here.

Speaking of the galley, here is how it looks now.

The rebuilt galley, ready for action.

And It Ended Like This
I Believe The Boat Repair Gods Demand I Sacrifice Driftwood in Their Honor

Monday, March 5, 2012

There's a Tunnel. And it Has Light at the End.

This past weekend presented an unexpected break from the winter darkness, and I just happened to be free to get to The Boat Yard to do some work. The to-do list is shortening, and the Nautical MasterCard has the room on it to get this thing done soon. The way I see it, here is what is left:
  • Finalize AC electrical. This is mostly a matter of finishing the wire runs to the panel and doing the final connections. The AC plan is simple: 2 outlets, a battery charger, and a small hot water heater. Low priority for launch, but easy to do.
  • Finalize fresh water system. Like the AC electrical, this is mostly a matter of final connections. I have to build a new pick-up tube for the water tank and just haven't sat down to measure and plan it out. This also includes tubing runs to the hot water tank and sink, but the basics are all in place including the pressure pump and the tubing runs to and from the water tank.
  • Finalize propane system. I need to purchase and install the LPG "sniffer" and solenoid shut off valve and connect the overboard drain on the propane locker. A one-day job.
  • Build up the engine bed for install. This is a big job, but mostly because I haven't decided how to do it. I am leaning toward just doing it with hardwood and fiberglass. I can't see a reason not to, and it's way easier than having aluminum fabbed to do the same job.
  • Exhaust system. I need to move the exhaust outlet to the port side of the boat to keep the hose run on one side, install the water-lock muffler, and run the hose. Most of this needs to be done before the engine is in. Likely I will build a base for the muffler at the same time I am building up the engine bed. Also, exhaust hose is brutally expensive.
  • A few miscellaneous hose runs for vents: fuel tank and holding tank, specifically. Quick jobs once I have the hose.
  • Bottom paint removal and repaint. Ugh. This job blows. There is no good way to get the paint off and it just takes forever. 
  • A few miscellaneous topsides jobs to get the boat ready for the water (engine controls, engine panel, tiller install...)
  • Mast wiring, polishing, and re-rigging. Most of the rigging will be done at the actual boat yard when we launch, and since I am probably installing a new furler at the same time, I'll likely just have the yard do all of the rigging. One less thing to worry about.
  • I'll also have to send the sails in to get them modified for the new furler. Can't forget that one...I have my eyes on new sails, but that will have to wait.
 Then we have her trucked to Port Townsend and the yard at SeaMarine.  They will do the final measuring and install of the prop shaft, including the dripless shaft seal and the prop itself. They will do the final engine hookup, alignment, and testing.

And then we're sailing. We can finish deck painting and brightwork in the water. Anything we don't get done before launch will have to happen in the marina.

In the short term, I did get some work done this weekend.

The stereo and VHF radio are installed and working. Having an 8 year old around to help run wire through lazarettes and lockers is very handy.
Child Labor Laws Don't Exist at The Boat Yard
Seriously, after I taught him how to use an electric screwdriver and zip ties, I just set him loose to bundle wire runs and pull new wires through bulkheads. I can't fit in that locker now that the batteries are also in place. Thanks kid.

A blurry picture of the stereo and VHF install. This is the starboard side, aft near the icebox. Reachable from the companionway.
We went back and forth on where to locate the electronics down below. Finally we settled on flush mounting them into the panel behind the starboard settee. This made wiring pretty easy and keeps things together, minimizing wire runs and clutter. The chartplotter will sit above these on a swivel mount so it can be seen from the cockpit.
The remote RAM Mic for the VHF, located in the aft bulkhead of the cockpit, behind the tiller.
I also managed to get about a quarter of the bottom stripped and sanded. That job is going to kill me. Probably literally.

Fair winds.

Friday, October 7, 2011

Photo Gallery - Because I Don't Feel Like Writing

The guts of the electrical panel.

The panel installed and partially wired.

The Raymarine ST40 Bi-Data instrument display.

Haven't decided exactly how to cover the back of the instruments yet.

Looking aft at the new panels

Now that we have DC power, the lighting is going in. Running lights? Check.

For LED bulbs, the new running lights are pretty bright.

LED cabin lights on either side of the companionway...

Each with the red light option.

Oh happy day. The big heavy box is here!