Monday, October 22, 2012

Splashed

In the water and ready to go
It has been three years since Peponi was hauled out, put on a truck, and blocked in the driveway at The Boat Yard. Now The Boat Yard is an empty driveway again and Peponi is a sailboat, in her slip at the Everett Marina, with an icebox full of beer and a locker full of foul weather gear.

I started getting impatient a few weeks ago when the good weather was threatening to disappear and we looked like we were close to being done.

But as close as we felt to being in the water, the list of remaining tasks was long.



Rigging
First came the rig, where the previous owner's pattern of neglect really cost us a lot of time and money.

On the haulout we struggled to even get the mast off the boat because corrosion at the mast step had virtually welded things together. The spreaders were similarly fused together. Every piece of hardware was corroded to whatever it was attached to. This meant drilling, grinding, cutting, and replacing just about everything. Luckily, RigRite.com still has all of the original rig parts for the CD 27. The only drawback is that you have to deal with the customer "service" at RigRite.

Detail of new spreaders
New spreaders, spreader sockets, tangs, masthead truck, sheaves, and halyards added a few boat bucks to the ledger. We ran the halyards internally, so add exit plates and rope clutches. This doesn't include the pending deck hardware needed to run the halyards aft to the cockpit. Add turning blocks, deck organizers, more rope clutches, and winches. Dollar signs.

Aside from the topping lift (which was lost along the way) all of the standing rigging went right back in place. And unlike everything else on the boat, the wire and turnbuckles were in great shape when we bought the boat. I had already run the wires and installed the masthead before the boat was trucked to Sea Marine, but everything else still had to be done.

Elton Schweitzer at Sea Marine was excellent at getting us rigged and ready. A big piece of the work was simply cleaning up all of the fittings, which had years of corrosion to deal with. We wire brushed everything down to clean metal and greased it all up to avoid it seizing up on us again. Instead of screws on most of the fittings, we went with the more proper rivets.

Elton solved a few issues with the running rigging as well (namely setting up a workable outhaul arrangement and an adjustable topping lift) and we were ready to go. Hayden and I made the trek to the yard on what turned out to be one of the last beautiful fall days in Puget Sound, and we worked on getting the mast up.

In keeping with the East African theme of Peponi, the coin under the mast is 20 Kenya shillings, a coin my world traveling partner just happened to have in her purse. I usually only carry US currency.
Kenya shillings under the mast
The short rig of the CD27 let us set the mast with a manlift instead of a full size crane, which was nice on the wallet. How it worked out that the lift, at full extension, was perfectly positioned to drop the mast onto the step is nothing more than good luck.

 
Setting the mast



The rig went up without incident, aside from one scary moment when I almost stepped off the ladder while walking it up to the deck. Once my heart settled down, we set the mast and installed new pins all around.


Peponi with the rig in place

It was such a shock to see the boat with the rig up after sitting in the driveway for so long. At this point we really started to feel close. Let's go sailing!

In the yard with the rig up!

Another view of the rig

Engine
The remaining details to figure out were all related to the engine and drive train. With the engine in place, we still needed to figure out the exhaust set up, the fuel system, and raw water. The details here are too tedious to list, but it was a few days of getting the right fittings, hoses, and other parts to get it all together. We came across a LOT of issues with the specs on the Beta Marine drawings and the actual specs of the engine. I should have verified every measurement on the actual engine when planning and purchasing. I already had to convert from metric to SAE on everything, and even then, the stated metric dimensions were usually wrong. Beta says the raw water intake is 7/8" (which is a dimension almost never found anywhere, and which made finding hose and fittings a real treat. Turns out the raw water intake is 3/4". Similarly, the fuel fittings are different from the line drawings. Worse, the fuel pick up on the Moehler tank is a different size than the fuel return. Awesome. We switched out some fittings and changed the hose ($$$) and everything worked out great.

Detail of engine mount
The engine system is made up of:
  • Beta Marine 14 hp Diesel
  • 75 amp alternator
  • PSS Dripless Shaft Seal
  • Mohler 13 gallon plastic fuel tank
  • Racor 500 primary filter/water separator
  • Groco water strainer 
  • Vetus waterlock muffler

In the end, and after not just a little head scratching, sketching, and consulting other mechanics, we came up with an exhaust plan that used a low profile Vetus waterlock and bellowed exhaust hose in order to maneuver around the various corners and through the maze that is the aft end of the boat.

Interior
After so long with tools strewn all over the place and things dirty and ripped up, I was really looking forward to returning the interior of the boat to something more than just a workspace. Cleaning it up was the first step. Power tools, hand tools, paint, spare parts, dirt, dust...she was a mess. Just getting all of the material and tools offloaded was a huge step. We finished up some painting and varnishing before the boat was splashed. Then, on the day of the sea trial, the new upholstery was added.
Sunbrella fabric on the interior upholstery

The v-berth with the new one-piece mattress. I think the fabric is named after some sort of wheat.
Launch
The launch went without incident. No leaks. No surprises. No problems.


Sea Trial
Hayden and I met Elton for an afternoon sea trial the day after the launch. I won't even try to describe the feeling of being out on the water for the very first time on a boat we have been rebuilding for 3 years.
Elton enjoying a little shakedown cruise.

The scene of the launch. Point Hudson Marina, Port Townsend WA.





























Wednesday, October 3, 2012

Power it, Rig it, Splash it

Peponi at the Final Stage
As I write this, Peponi is days away from being ready to launch. I know this because the invoice from the yard just came. Ouch. 

The engine is fully installed, the drivetrain is finalized, the wiring is done, and the rigging is being put together. We had her trucked to Port Townsend and the yard at Sea Marine, where after being passed off from mechanic to mechanic, we finally got some things rolling along. 

I love Port Townsend. Sure, it's a little too obviously "hip" and the artist/craftsman/hipster vibe is a little overwhelming most of the time, but there is something about the shipyard and maritime industries in this historic seaport that just feels right. Plus, on any given day you might see ships from The Deadliest Catch out for refit or even something like this...

Cinephiles Like Michael Bolton Might Recognize this Ship


That is Lady Washington, which has been used in a couple of the Pirates of the Caribbean films and, weirdly, on Star Trek. Seeing this tall ship out of the water and being worked on my a team of about 50-60 people was impressive. In two days they had her out, cleaned, repaired, painted, and splashed. If only we were so efficient.

Our other neighbors in Port Townsend aren't nautical celebrities. But I do love boatyards. There are two or three boats in the yard that I wouldn't kick out of the marina, if you know what I mean. Hidden in here somewhere are two really nice Etchells  30s. Sweet.


Some of the other neighbors

The bottom paint took a little abuse in the delivery


Final installation of the engine required some more modifications to the stringers I had built up to lift the engine into alignment. In order for the oil sump plumbing and the shifting to have enough clearance, the stringers had to be carved out, as can be seen in the next two photos.
Modifying the stringers for the final engine fit

Ready for the final installation.

I claim poverty on the prop choice. In order to match the engine output we needed a three-blade propeller. The dimensions of the aperture made a two blade unfeasible. Plus, a two blade prop with the full keel design would be a nightmare for maneuvering around marinas. But the three blade prop will create a lot of drag under sail. I'll save pennies for a feathering prop on the next haulout.

The old cutlass bearing was so comfortable in place that it had to be ground out. A new prop shaft was made for us at Tacoma Propeller. Once it arrived, the rest of the drivetrain could be finalized.

Here is where we almost hit a dead end. There is not enough clearance in the aperture to slide the prop onto the shaft. The guys in the yard and I stood and stared at it for a while. After several very expensive ideas were floated (pulling the engine again, removing the rudder...) Someone figured out that with the rudder hard to starboard, the prop could be feathered around it and into the space.

At least we don't have to worry about the shaft backing out of the boat if the set screws give way.



What's the greatest, most utilitarian invention in recent boating history? That's right, it's the PSS shaft seal from PYI Technologies. I installed one on our last boat and would never think of having a sailboat without one again. They are relatively cheap, very easy to install, and maintenance free. And on a boat like ours with almost no space to work with behind the engine, there is value in only having to squeeze into the lazarette once to install it.

Elton working on some final alignment details

Below you can see the PSS Shaft Seal installed with about 3/4" of clearance. The flexible coupling on the engine is also a nice addition. The black hose you see is for the heat exchanger connection to the hot water heater, which is yet to be finalized.


The Driveshaft and PSS Shaft Seal
As we creep toward finally having a functional boat, and I look forward to a "Before and After" post here on the blog, the best late summer in recent memory is trying to slip away from us. It's still warm and sunny here in the Northwest despite the calendar changing over to October. We have reserved our slip at the Everett Marina and are on the waiting list at a smaller marina closer to home.

We're ready for Peponi to be in the water! But in the meantime there's always the Typhoon sitting in the garage just waiting to be taken out.


Meanwhile, there's always this

Sunday, August 26, 2012

Trucks Come, Trucks Go

Countdown to Delivery
In my life as a writer I find myself working right up to deadline most of the time. I know it drives editors crazy, but for some reason I do seem to function better on short timelines.

Which is all good, because two weeks ago I scheduled the boat transport truck to come and pick up Peponi. And I still had a LOT of work left to do before that day. So I set to it. Three coats of new bottom paint, mast wiring, battery install, charger install, fresh water system final hook ups, water heater wiring, electrical panel final hook ups, some paint here and there, and cleaning my way off the boat.


I also made a new filler board for the v-berth, as our mattress was made to fill the whole space. I painted the cabin sole in the head, varnished some of the interior teak, and built a shelf for the new electronics to bolt to. More than one late night was spent in a slight panic as I imagined all of the things I hadn't yet done.

The truck was scheduled to come on a Saturday. Friday night at around midnight I took the last of my tools and materials off and closed the companionway. I took the extension cords down and rolled up some painting tarps. And I went to bed, where I slept not at all.

Here are some of the final projects in color photograph format.

Black bottom paint over the first coat of red. Hull is polished and toerail is varnished.
A look at the beige accent paint that is going on all of the nonskid. On the foredeck I will add grit to the paint.

New engine in flight.

New engine in place. I had to cut the companionway to 18" wide to fit it through the gap.
Fresh water system primed and working.
Peponi's electronic suite. This is on the starboard side, aft end of the settee.
New filler board for the v-berth.
Child labor on the night shift, wiring the mast.
Masthead showing the anchor light, wind vane, and Windex mount. New tangs for the  shrouds as well.
The companionway.
The companionway under red lights.
The Day of the Truck
Where was Gus Sebastian when I had the boat hauled to the house in the first place? This guy is awesome. He arrived at 8:00 a.m. just as planned and had no trouble backing down our narrow curvy driveway with his 45 foot trailer.

If you need a boat hauler in the Northwest, this is your guy.
Gus backing in to pick up the boat.

Gus rocked the set up and backed the trailer right on point with one shot. Perfectly centered. Then came time to lift the boat off the blocks, so he enlisted a helper with a lot of XBOX experience...

Taylor learning to lift the boat. "Don't drop it," says Gus. Nice.

Then, before we knew it, she was off to the actual boat yard...

I'll admit to being a little choked up when she pulled away.
Before the truck cleared the driveway, my dad was already tearing down the stairway he had built to access the boat while we worked on it. And then I set to pressure washing the evidence away. 

Peponi now sits at Sea Marine in Port Townsend. They will do the final hookup of the engine, splash the boat and put up the rig. While they are doing that, I'll sneak over after dark and finish some detail work on deck and down below.

And then it's time to sail her home to her slip in Everett. Can't wait.

Meanwhile...
So last week while doing my usual scan of Craigslist for deals on boating stuff, I came across an add for a Cape Dory Typhoon Weekender. Cheap. Figuring something was probably wrong with it, I went to take a look, and damnit, the thing was perfect. The end result is that two hours after Peponi left for the shipyards, this happened.

1973 Cape Dory Typhoon Weekender. The newest resident of the Boat yard.
I might have a Cape Dory problem.

But with results like this, how can I complain?


Saturday, August 18, 2012

So Close We Can Taste It. Wait, That Might be Epoxy I Taste.

Pick Up
The truck comes next week to pick up our boat and deliver her to the marina where final engine installation and rigging will take place.

Mind you, I'm nowhere near ready, but once that truck shows up, the work at The BoatYard is over no matter what, so...

Over the last week or so I have finalized the fresh water system, the AC system, and a few other details. Before she is ready for the experts to take over, I still have to:
  • Finish the bottom paint
  • Hoist the engine into place
  • Install the engine controls
  • Wire the mast
  • Install the masthead
  • Finalize the electronics install
The new interior cushions are waiting for us at the shipyard, as are all the new rigging parts. Once delivered, it will be about two weeks before we're in the water. Just in time for the end of summer!

No Longer Anonymous
Our little sloop is no longer nameless. She was nameless when we bought her (the previous owner vaguely remembered calling her "Boomer" or something). But no more. Honoring Hayden's love of East Africa and our connection to one of the greatest places on the planet, our sloop is now named "Peponi," which means "paradise" or "in the wind" depending on who you ask or how it is translated. Either way, perfect. Peponi is also the name of a beautiful hotel in Lamu, Kenya. Lamu is far and away my favorite place in the world. Somali pirates not withstanding.
Peponi means "Paradise" in Swahili. Sort of.
Priorities
As much as I dreamed of having a gleaming, perfect boat ready to launch when the truck came, I simply had to prioritize things into two categories: Before Splash and After Splash. Quite simply it came down to what needed to be done before the boat could hit the water and be functional (basic systems, integrity of the hull, and bottom paint) and what we could do once she was in her slip at the marina (interior finishing, "luxury" systems, deck work, etc.) So we have several projects outstanding that simply won't get done before we are in the water. But we are very, very close to being ready to sail.

I took advantage of being out of the water and not paying rent to do a few days' worth of finish work on the hull. It came to us chalky, scratched, and basically nasty. I had to repaint the transom (not a perfect job but it definitely passes the 3 foot rule). For the rest of the hull I used a combination of rubbing compound, 1500 grit sandpaper, and wax to get her up to a decent shine. 30 years of neglect can really wreck gel coat. Short of repainting, I think we did the best we could.

Not a brand new boat, but not neglected either.
Much of the teak on deck will have to be done later, but I did take a day to completely sand the toe rails (which took forever to get down to bare wood) and refinish them with 4 coats of Cetol varnish.

 
Toe rail refinished (and new registration #s too!)
One rather comical result of the location of the boat in the driveway is that the port side gets far more attention than starboard. The port side faces the beach and the southern sun, and has a big concrete driveway to work from. The starboard side is right up against the edge of the driveway, and the mast is stored on sawhorses right there, making moving ladders around and whatnot quite a pain. Let's just say the port side looks a little better.

Other Stuff
Not as cool to look at, but more important things have also happened.

I bought a used iPod on EBay to leave plugged into our new Fusion stereo. I just loaded all of my music onto it and now we have a portable juke box. 32 GB worth. That ought to do. And when it gets old, we can just click over to XM satellite radio, which is rather worthless on land in the Puget Sound because of all the trees and whatnot, but on the water it is perfect.

The simple AC system (two outlets, a battery charger, a water heater) is wired.
AC wiring in progress. Probably not to code. But it works.
Wiring the boat has been the biggest learning experience of this project for me. I will do it very differently next time (heh heh) based on what I learned about circuitry and wiring. What I did is technically fine but could be more efficient and better planned. The wire runs are redundant in some places and I made full end runs for each appliance rather than making branch circuits. Again, it's fine (and will be easier to troubleshoot if a lamp goes out) but the wire runs are bulky and the panel is crowded). So far I love the location of the panels I built. I can reach both from the cockpit, they are easy to access, and they are out of the way.

Fun with Fiberglass
If there is a second place finisher in the "what I learned most about" contest, it is epoxy and fiberglass. Now I want to use that shit to fix everything. My last chance to really glass anything will be after the engine goes into place, because I'll have to cut out the companionway to get it to fit. The opening under the stairs is 15" across. The minimum dimension of our new Beta 14 is 18". Sigh.

The last thing I glassed in was a new platform for the starting battery and the muffler.
A Group 24 battery box and Vetus Muffler go here

Engine
The thing I may be happiest about is the new engine. A lightweight, quiet, shiny red Beta 14. Last weekend I installed the engine control panel in the cockpit. Of course, I had to tear the old one out, glass in the space, and recut it for the new panel. But it looks ok.


Top of the Mast
I'm sure in parts of the country where boats are hauled out for the winter it is far easier and more common to maintain the gear at the head of the mast, but when the stick stays in the boat year after year, the summit of the boat gets neglected like crazy. No one likes to be hoisted up there to change a lightbulb. I've been working on the masthead electronics and wiring while the mast is down. Here is where we stand now.
Anchor light, Windex, and wind instrument


Stay Tuned
Photos of the delivery and other final work to come. And then a series of Before/After shots of the entire project. After that it should just be photos of sunsets, cocktails, and the rail in the water as we sail around the Puget Sound.


Tuesday, April 24, 2012

Other People's Mistakes and Lessons Learned Therefrom

It Started Like This
Coffee to start the work weekend at The Boat Yard. All I can think of is how great our boat will look on the mooring out there.
 

What's Under All That Paint?
I truly thought I was done uncovering the sins of the Previous Owner. We discovered his prohibition era whiskey stash under the v-berth. We unwound his "installation" of orange extension cords that stood in for an AC system, we pulled rusty staples out of the woodwork, and replaced brittle PVC pipe with actual marine grade hose. We took the ghastly outboard bracket off the stern.

That was the first weekend.

Then we discovered engine controls tied together with twine and a muffler hanging from the lazarette by a cup hook. Oh, and an engine that was so addicted to starting fluid that it was beyond any rehab program and had to be put to pasture.

Then we started stripping the bottom paint. At least 10 layers of old, red, ablative paint. In some places it simply flaked off like peeling a hard boiled egg. In others it was as permanent as welded steel.

Several months ago I found the first major sin. PO had, at one point, attempted to convert the aft cockpit locker into an outboard well. He, or more likely some dirtbag at the shipyard with a Sawzall, had cut a gap out in the bottom of this locker, just forward of the transom. Some sort of bracket was then bolted to the forward bulkhead of the locker. In theory, an outboard would then be hidden in this nice little locker, hidden from sight and pushing the boat along at a better clip than the little Yanmar thumper under the cockpit. It should be noted here that all of this was done in the place of actually maintaining or fixing the problems with the inboard engine. It just got to sit there and rust (when it wasn't used as a generator to charge the Sears DieHard automotive battery).

A look at the stern and the ill-fated outboard well the PO tried to create. Note that the antifouling line comes up just high enough to cover it up.
The main problem with this outboard well, aside from the fact that the boat wasn't designed for a big cutout under the transom, right behind the rudder, is that the locker itself isn't watertight. It, in fact, is wide open to the rest of the boat (a little design flaw that I intend to rectify before we go off shore...if the flimsy hatch on that locker came off or was stove in by a boarding wave, the whole boat could downflood).  So I'm sure the first time he fired the outboard up and got up to boat speed, the stern sat down in the water, and the stern wave rose up and flooded the boat.

So they likely hauled the boat right out and "fixed" their fix. This fix is what I found when I stripped the bottom paint off the stern. A crappy, unfinished, unsealed fiberglass job covering a 1 foot square hole in the boat.

And this revelation eventually led to another. The one that I spent this weekend cursing the PO for.

The CD 27 originally had anti-fouling paint to the waterline, a 1inch or so gap and then a 3 inch boot stripe (red). Here is a look at another CD 27 with something close to the original look.

Not our 27, but she looks nice.
With our boat, here's what I imagine happened to this look. The PO started loading the boat up with things like, oh I don't know, extra outboard engines and extension cords. As he did so, the resting waterline of the boat dropped a bit. And this, along with what is obviously some long-term neglect, let to marine growth above the waterline.

Then, when he cut that giant hole in the boat and subsequently "repaired" it, he had to cover up his sins. The answer? Raise the waterline. So...when we got this boat, the antifouling paint was about 5 inches higher on the hull than it originally was, a fact I did not notice until I started stripping the paint.

(Is this where I tell you also that he apparently used both hard and ablative antifouling paint on top of one another? Awesome.)

Here is what the boat looks like right now (on the port side, anyway)

Naked Boat.
Want a walk-through? Ok. The blue is just painter's tape that marks the level of the old antifouling paint. It took epic work days to get here. I could have just smoothed the surface of the old paint a little bit and moved on, but the old paint was in terrible shape, and like everything else I've decided to do it right the first time. I think the extra work will be worth it. I hope. There was so much paint on there that just this one side took two gallons of chemical stripper (Interlux 299e for those boat yard nerds out there) and about a million sanding sheets. But now we're down to this.

Ok, HALF Naked Boat
So here is a look from the bow, where I can show you what stripping the paint reveals. Notice on the starboard side there is a little blue paint under the red? In this picture you can see the original look (somewhat). Starting at the blue painter's tape, you can see the dark red. That is the antifouling paint the PO put on with a spatula. But where the antifouling has been removed, you can see a lighter red color. This is the original boot stripe. Then just below that, a 1 inch gap of white gel coat. Below that, the original waterline. See the blue paint? This was the original primer coat. Where I can find the upper edge of the blue primer, I can find the original waterline. And the top of the extended antifouling is the top of the original boot stripe (or near enough, anyway).

Another look at the starboard side paint excavation. Blue primer under antifouling, light red bootstripe under antifouling.
So now I am stuck in my own "do it right the first time" rule, because the "right" thing to do is to carefully reconstruct the original look, stripping the hull all the way down, re-establishing the waterline and boot stripe, and then repainting. But holy hell that seems like a lot of work, and getting a good do on a boot stripe is - according to every boatyard guy I've talked to - one of the hardest things to do in boat painting.

After cursing and kicking things around The Boat Yard, I settled down and went to the web and my trusty colleagues at the Cape Dory discussion boards. It turns out it is pretty common to paint up over the boot stripe. The waterline on the CD 27 was, well, optimistic, and even a lightly loaded boat rode low enough to get marine growth above the theoretical waterline.

There were even some nice photos of boats without the boot stripe, looking very salty indeed.

Photo by Gary Cohen
So, I am starting to lean toward keeping the raised waterline and painting up to it with primer and antifouling, but I haven't made the final decision yet.

Meanwhile, the paint removal has uncovered what HAVE to be the last sins of previous owners. Specifically I have unearthed evidence of a pretty nasty grounding. The rudder appears to be almost completely rebuilt. And not well, I should add. The fiberglass is pockmarked and thin, wide open to water intrusion (which explains why the rudder post dripped water for a month after we hauled her out.

I punched two 1/4" holes in the bottom of it recently just to make sure it is dried out. It seems solid around the rudder post (no play) and sounds fair when wrapped with a plastic hammer, so I don't think it warrants a full rebuild. But I do need to fair in the pockmarks and but down a good sealer coat.

Also, the leading edge and the bottom of the keel are full of repaired spots. I know boats hit the bottom on occasion, so I'm not cursing the PO for that, but I am skeptical enough of the work that has been done on this boat that I am grinding out a few of these larger repairs and doing them myself before repainting anything.

Break Time!
The Management of The Boat Yard has Upgraded the Beverage Selection

The Painting
I will be laying down several coats of Interlux 2000e, a two-part sealer/primer that is used to protect fiberglass from water intrusion and blistering. This is a not cheap step that nonetheless makes me far less worried about the fact that my scraping and grinding and chemical stripping has more or less destroyed the gel coat below the waterline.

Then it is the Northwest standard copper ablative paint, which as yet hasn't been completely banned in Washington.

The Interlux primer is gray. I will do the first couple of coats of ablative in red and the last coat in black. This simple old trick makes it very clear when the effective top coat has washed away and when it is time to repaint. Also, in theory, on the next haulout I can just go down to where everything is red and then re-coat.

Small Stuff
This past weekend also found me finalizing some wiring projects (propane solenoid is wired and functioning, for example). One thing I installed is a propane sniffer.

It is a simple but not cheap product that sounds an audible alarm when propane fumes reach 20% of the low explosive level in the boat. The sniffer is in the bilge well above any realistic water level.
This little guy keeps us from 'sploding
The propane sniffer instrument tucked away under the galley stove.
The panel instrument is on a panel right underneath the galley stove, where I will also put the three-way bilge pump switch and the fuel gage.  The CD 27, like a lot of old boats has very little usable panel space for electronics and instruments, so I'm being creative here.

Speaking of the galley, here is how it looks now.

The rebuilt galley, ready for action.

And It Ended Like This
I Believe The Boat Repair Gods Demand I Sacrifice Driftwood in Their Honor